3v0-624 Guide

3v0-624 Exam Royal Pack (In Stock.)

 
  • VMware
  • Exam Number/Code 3v0-624
  • Product Name VMware Certified Advanced Professional 6.5 - Data Center Virtualization Design Exam
  • Questions and Answers
  • 60 Q&As
  • Last Updated
  • Jun 18,2018
  • List Price
  • $128.99
  • Price
  • Today 49.99 USD

Free TrialVersion: demo Buy Now 50% OFF

Top VMware 3V0-624 preparation exams Choices

Your success in VMware 3V0-624 is our sole target and we develop all our 3V0-624 braindumps in a way that facilitates the attainment of this target. Not only is our 3V0-624 study material the best you can find, it is also the most detailed and the most updated. 3V0-624 Practice Exams for VMware 3V0-624 are written to the highest standards of technical accuracy.

P.S. Validated 3V0-624 software are available on Google Drive, GET MORE: https://drive.google.com/open?id=1AdP-kxdhQXyY8voAK3_SvgcNZ8Cx9Zod


New VMware 3V0-624 Exam Dumps Collection (Question 2 - Question 11)

New Questions 2

A business organization has different types of network traffic, and all the types of traffic must be kept separated. The design architect knows that the number of required networks is greater than the number of physical ports in the system.

Which three choices can the architect use to keep the traffic separated? (Choose three.)

A. Combine vMotion, Management, and vSAN to one VMkenel port.

B. Configure VLANs to create separate networks.

C. Purchase hardware that supports a greater number of network ports.

D. Utilize Private VLANs.

Answer: ABD


New Questions 3

A virtualization administrator has been tasked with migrating several business applications from physical to virtual. The administrator must also migrate the virtual machines from VMware Workstation to vSphere 6.5, using vCenter Converter Standalone 6.1.

In this scenario, when two source types are supported? (Choose two.)

A. powered-off Windows Server 2008 physical machine

B. powered-on Windows Server 2000 Workstation virtual machine

C. powered-off Windows Server 2008 Workstation virtual machine

D. powered-on Windows Server 2008 physical machine

Answer: AB


New Questions 4

Drag each option to its appropriate concept.

Answer:


New Questions 5

A company is implementing a new ESXi host cluster at its New York data center.

u2022 The CIO has stated that the new ESXi cluster should be deigned with enough failover capacity to sustain two ESXi host failures.

u2022 Six ESXi hosts have been approved for this workload.

u2022 The ESXi hosts are to be purchased from Dell with these specifications:

u2022 2x10 core 2.2GHz Intel CPU

u2022 128 GB of memory

u2022 The workload is defined as 150 employee desktop virtual machines each with 3GB RAM reserved.

u2022 All virtual machines should be protected by vSphere High Availability Which are two true statements regarding failover capacity? (Choose two.)

A. vSphete HA can be configured to reserve 25% of memory capacity for failover.

B. vSphete HA can be configured to specify two dedicated failover hosts.

C. vSphere HA can be configured to reserve 35% of memory capacity for failover.

D. vSphere HA can be configured to specify one dedicated failover host.

Answer: CD


New Questions 6

In the vCenter HA configuration below, drag the two correct components to the blank boxes in this diagram. The same component may be used more twice (Choose two.)

Answer:


New Questions 7

A leading steel manufacturer relies on SAP for purchase, sales, add invoice processing.

u2022 It is planning to virtualize its severs to reduce CAPEX and OPEX.

u2022 However, its CIO is concerned about the availability, performance, manageability, recoverability, and security for the SAP database and ERP instance.

Match the business requirement with the appropriate design concept.

Answer:


New Questions 8

Categorize the tools as providing either Availability or Recoverability.

Answer:


New Questions 9

Match the business statement to its appropriate concept.

Answer:


New Questions 10

A company has one data center site running 50 hosts and 400 virtual machines and requires a vSphere 6.x design.

1. The CIO wants to add a secondary site for Disaster Recovery (DR) with A hours RPO.

2. The application developer is concerned about anticipated growth as several new projects begin.

3. The CISO is worried about data leaks and theft.

4. The CTO would like to buy new servers with better specifications and higher consolidation ratio.

Determine the critical requirements for each of the key stakeholders. Some requirements might have more than one stakeholder.

Answer:


New Questions 11

A customer wants to make its data available with a RPO of 10 minutes. Replication to the second data center will be done using the network.

Which type of storage configuration should be used?

A. NFS datastore on ESXi 6.0 with vSphere replication appliance 6.0

B. VMFS datastore on ESXi 6.0 with vSphere replication appliance 6.5

C. vSAN datastore on ESXi 6.0 with vSphere replication appliance 6.5

D. VMFS datastore on ESXi 6.0 with vSphere replication appliance 6.0

Answer: B


Recommend!! Get the Validated 3V0-624 dumps in VCE and PDF From Surepassexam, Welcome to download: https://www.surepassexam.com/3V0-624-exam-dumps.html (New Q&As Version)


To know more about the 3v0-624, click here.

Tagged as : VMware 3v0-624 Dumps, Download 3v0-624 pdf, 3v0-624 VCE, 3v0-624 pass4sure, examcollection 3v0-624